We finished the home this Fall (2009) after approximately 1 year in construction (during 6 months of the Colorado winter).
We were very pleased with the modifications to the basic structure we requested and your design of a breezeway that connected to the detached garage we added.
The logs were delivered as you promised on the exact day we had arranged for a crane to erect the log shell.
Your log shell was easily erected in less than three days with the expert assistance of your construction supervisor, Mike. He went way above and beyond anything that just resembled supervision.
The perfection of the log structure made the assembly easy, and further conventional framing was facilitated by the joinery you included with this model.